Mumbai-Ahmedabad Bullet Train Project – Ahmedabad, India






Client: National High Speed Rail Corporation Limited (NHSRCL)
Location: Ahmedabad, Gujarat, India
Project Duration: Ongoing, with expected corridor sections operational by 2026-2028
Project Overview
SEERAJ GROUP is proud to be a key heavy lifting and logistics partner in India’s historic first Bullet Train project—the Mumbai-Ahmedabad High-Speed Rail Corridor. This landmark infrastructure endeavor is redefining India’s transportation landscape by introducing ultra-modern, high-speed rail connectivity capable of running trains at speeds up to 320 kmph. As the nation’s flagship initiative in technological progress and sustainable development, it is set to dramatically boost economic growth, reduce travel times, and position India among the leaders in advanced rail transport globally.
Project Scope & Significance
The Mumbai-Ahmedabad corridor stretches over 508 km, connecting major cities across Maharashtra and Gujarat. This bullet train project is a testament to Indo-Japanese collaboration and innovation, utilizing cutting-edge Shinkansen technology for unprecedented safety and reliability. SEERAJ GROUP’s role encompasses critical heavy lifting and transport services, delivering seamless support for the erection, installation, and on-site movement of heavy equipment critical to the project’s success.
Challenges & Unique Aspects
Bullet train projects demand exacting standards of precision, safety, and efficiency. Unique challenges included:
- Lifting and installing ultra-heavy and oversized components on elevated viaducts and underground sections.
- Maintaining strict timelines amidst complex logistics and construction coordination across diverse terrain.
- Managing work in confined urban and semi-urban sites demanding mobility and adaptable equipment.
- Integration with Japan’s sophisticated rail technology requiring expert handling and meticulous project management to minimize downtime and risk.
Equipment & Fleet Used
SEERAJ GROUP deployed a versatile fleet tailored for heavy, precise lifting operations:
- 7 units of 23 Ton Pick and Carry FARANA cranes
- 2 units of 150 Ton Crawler cranes
- 3 units of 70 Ton Tyre Mounted cranes
- 1 unit of 130 Ton Tyre Mounted crane
- 1 unit of 75 Ton Crawler crane
- 1 unit of 40 Ton Crawler crane
This diverse equipment mix ensures flexibility and optimal performance across all phases and site conditions.
Role & Services by SEERAJ GROUP
- Heavy equipment lifting and placement during viaduct construction, station building, and track installation.
- Detailed logistics planning ensuring smooth transport and delivery of large-scale components to site in sync with construction phases.
- Expert rigging and lifting plans customized to meet the exacting technical and safety specifications of high-speed rail infrastructure.
- On-site supervision and technical support guaranteeing seamless integration with contractor operations and progressive milestones.
Innovative Solutions & Project Highlights
To overcome the project’s complexities, SEERAJ GROUP introduced:
- Adaptive utilization of crawler cranes and pick-and-carry cranes to maneuver through dense urban construction zones.
- Collaboration with Japanese and Indian engineering teams to align lifting methodologies with Shinkansen technology demands.
- Real-time monitoring and predictive maintenance of equipment to minimize operational downtime.
- Strategic scheduling allowing multi-site simultaneous operations supporting the accelerated timelines of this flagship project.
As the Mumbai-Ahmedabad Bullet Train project progresses, SEERAJ GROUP remains committed to delivering high-quality, innovative, and safe lifting and logistical support—powering India’s journey to future-ready transportation.